Bay 4 Refit

Client: Severfield

Project: Bay 4 Refit

Scope:  Strip out replace and upgrade existing obsolete mains distribution equipment

Completed: December 2018

Project value: £40,000.00

Project Overview:

Strip out obsolete distribution equipment renew and upgrade to suit current requirements

Work Carried out

Strip out and removed all the obsolete electrical distribution equipment & sub main feeds. Install new sub main cables & containment,  Installation of new sub main Section boards and distribution boards. Upgraded all Mains Equipotential Earth Bonding to Bay 4.

Install new sub circuits feeding 110v Sockets, 230v General Purpose Sockets and 400v welding sockets & additional T5 type Angled poised Lighting to working bay areas. Refurbish the existing high bay lighting with a full retube and deep clean.

Key Challenges

Working in an industrial environment & maintaining strict timescales.

Added Value: 

We improved the safety of the working environment with the installation of a modern switchgear arrangement which offers far superior protection & also with the improved lighting level in all work areas. The installation was fully tested with NICEIC test certificates supplied as standard along with As Fitted drawings and all relevant maintenance schedules and data sheets in the Operational manuals issued.